Virginia City Hybrid Energy Center
The Virginia City Hybrid Energy Center project required a pre-packaged electric fire pump system designed to NFPA 20. The system includes a 125 HP electric fire pump, ATL controller, bypass piping, flow meter, test header and jockey pump. The system is mounted on a structural steel base with 1/4" treadplate. The complete assembly was hydro-statically and electrically tested at the factory prior to shipment.
LOCATION - St. Paul, VA
DUTY POINT - 1,500 GPM @ 110 PSIG