JOB: New Dormitory & Central Boiler Plant - SUNY
LOCATION: Binghamton, NY
ENGINEER: Sear Brown Group
CONTRACTOR: Tougher Industries
DISTRIBUTOR: Emerson-Swan, Inc.
SYSTEM INFORMATION:
This project includes two packaged systems, one for the Hot Water and one for the Chilled Water System. The hot water system is designed for 345 gpm @75 ft of boost and the chilled water system is designed for 107 gpm @55 ft of boost.
Each System has a stand-alone Landis & Gyr controller to perform all system functions including varying the speed of the system depending upon the feedback signal from the remote differential pressure sensor.